Alton Community Unit School District #11
2005-2006
Contract Amount:  $8.6 Million
Reference: Jack Martin - Plant Facilities and Maintenance Administrator
Project Description: GRP installs Heating and Air-condition Systems to improve the learning environment for the children.  This fast pace work brought the much needed A/C to 3 of the 5 schools in less than 45 working days.   GRP used an innovative design and installation method saving the district hundreds of thousands of dollars by not disturbing any of the asbestos in the schools.

Carrollton School  Unit District #1 - New Addition and Renovation of HVAC system
2004-2005
Contract Amount:  $700,000
Reference: Mike Barry - District Superintendent
Project Description: This project consisted of a HVAC retrofit solution of existing 1962 addition, as well as designing and installing new control and HVAC system for the new 2004 addition.

Midwest Metal Coatings, LLC
1998 - 1999
Project Contract:  $1,500,000
Reference:  Mr. Joe Darling - Midwest Metals Plant Manager
Project Description:   This project entailed all aspects of piping which included: all site utilities (fire, water, domestic water, sanitary sewer, and storm piping), process and building steam and condensate piping systems, plant gas system, plant compressed air system, waste water treatment piping, all hydraulic systems piping, plant and office HVAC, and plumbing systems.  Some of the equipment GRP installed on this project was a 500 horsepower boiler and a forty ton waste heat recovery boiler.

BOC Plant - Hartford, IL
1995 - 1996
Project Contract:  $6,000,000
Reference:  Mr. Dick Cornilius - BOC Project Superintendent
Project Description:   This project was a joint venture, design and build project that included extensive piping and equipment installation.  Some of the equipment that we installed was a 10,000 gallon cooling tower, a 15,000 horsepower air compressor, chillers, heat exchangers, pumps, all instrumentation, etc.  GRP was also responsible for all small and large bore pipe fabrication, which included managing two twelve hour shifts during the length of the project.

Argosy Gaming - Alton, IL
1996
Lawrenceburg, IN Casino
Project Contract:  $1,700,000
Reference:  Mr. Denny Crank - Argosy Gaming Corporate Engineer
Project Description:   This was a design and build project that included all HVAC for the new riverboat casino for Argosy Gaming which will be located in Lawrenceburg, Indiana.  The project consists of 1400 tons of chiller water (4 - 350 ton chillers), 38 AHU's with chill water and electric heat, pumps, etc.  River water acts as the condenser water thru special bulkhead penetrations in the vessel.

S.I.U. - Edwardsville
Two Stage Chiller
1992
Project Contract:   $700,000
Project Description:   This was a plan and spec project that included the installation of a Trane two stage 1100 ton absorption chiller, pumps, etc.  This is the only two stage absorption chiller located in the metro area.




Local Mechanical Contractor


From Concept to Completion
Commitment to Safety and Quality through
Innovation



Design and Build
Mechanical Piping
Fabrication
Food Grade Welding
Plumbing
Controls
Modular Skids
Pipelines
HVAC
Refrigeration





Innovation from Concept to Completion

24 hour Emergency Service

 
Copyright 2008 GRP Mechanical Company, Inc. All Rights Reserved.
1 Mechanical Dr.
PO Box 188
Bethalto, IL 62010

Phone: 618.258.9000
Fax: 618.258.9090
www.grpmech.com

Home     About Us     Mission     Service Provided     Awards     Contact Us